Product Description:
used gas turbine power plant main datas
1. We are manufacturer which provides EPC and turnkey project.
Also we supply power plant design, power plant equipments dismantlement, equipments overhaul, packing, used equipments export formalities, transportation, power plant installation and operation.
2. Manufacture Year: 1996
Running Hours: 8031h
Power:55MW
1#2# gas turbine 2 MS6551Bnatural gas/light oil 38.72MW America GE 1996
1#2# steam turbine 2 C15-3.43/0.981-3 15MW;50t/h Nanjing Turbine& Electric Machinery Co 1998
1# Exhaust heat boiler 1 Q394/539(201)-66(9.5)-3.82/450(0.25) 66t/h China ship 703 Institute 1998
2# Exhaust heat boiler 1 Q391/542-66(9.5)-3.82(0.25)/450(138) 66t/h Hangzhou boiler company 1998
1#2# assistant fuel boiler 2 UG-35/3.82-Y2 35t/h Wuxi boiler company 1998
Gas turbine generator 2 6A3 45400KVA America GE 1996
Steam turbine generator 2 QFW-15-2A-10.5KV 15MW Nanjing Turbine& Electric Machinery Co 1998
DCS control system 1 AS220EA(TELEPERM ME) Nanjing Siemens power plant robotization co. 1998
Gas turbine control system 2 SPEEDTRONIC Mark V America GE 1996
Gas turbine generator excitation control system 2 EX2000R America GE 1996
Gas turbine generator control panel 2 America GE
Company Contact:
Contact Name: Ms. Mina
Company Name: Hubei Teweite Power Technology Co., Ltd.
Email:
Tel: 86-130-58100008
Fax: 86-0755-89900623
Street Address: 505 Room Of Yulong
Fu, Julong Yuan, Longgang Rd,
Longgang Community, Longgang
Subdistrict, Shenzhen City, China.
Website:
http://www.sztwt.net
Member name: sztwt01
Country:
China
Member Since: 27 July 2010
Total Leads:
149 sztwt01 Import Export Business Leads
Business focus: Used Power Plant, Gas Turbine, Generator, High Pressure Air Compressor, Vanadium Corrosion Inhibitor
Chat:
Verify:
Safe Import Export Tips